On May, 2016, Enaval signed another contract with Petrobras: the Contract for Project
Execution, Manufacturing and Installation of the Final Accommodation Modules
(MDA) for the P-19 Platform of the Exploration and Production Operations Unit (UO)
of Bacia de Campos. The contract deadline for the project delivery is 365 from the AS
signature, firmed in June 26 th , 2016. The MDA will consist of 12 cabins suite like, built
in a three floors disposition with four cabins each, which will be united by a circulation
corridor and access stairs to the P-19 Module. The service scope includes formulation of
all basic and detailed engineering, purchasing of all materials and equipment, besides
the Modules manufacturing, assembling and install on board, as well as their
interconnections, integration and commissioning at the P-19 Platform. This project is
about to end. Many materials and equipment had already been purchased and the
structure building is quite advanced.